Requests For Proposals
GDS offers expertise in the management of resource solicitation projects and the evaluation of sales proposals. From production and release of the solicitation, to final contract negotiation, we have managed dozens of national solicitations resulting in substantial long-term power cost savings.
NCEMPA Battery Energy Storage System RFP
Power Supply | Release Date: 1/14/2021 | Due Date: 03/11/2021
NCEMPA Battery Energy Storage System RFP | Contact Matt Smith
Supporting Documents:
- Attachment A – Notice of Intent to Respond Form
- Attachment B – Technical Proposal Form
- Pre-Bid Conference Presentation PDF
- Pre-Bid Conference Meeting Recording
- NCEMPA BESS RFP Q&A
Borough of Chambersburg, PA – Falling Spring Design/Build, Gas-Fired Generation RFP
Power Supply | Release Date: 11/06/2020 | Due Date: 12/04/2020
Borough of Chambersburg RFP- Falling Spring Design/Build, Gas-Fired Generation RFP | Contact Erin Shealy
Supporting Documents:
- Falling Spring Appendix A
- Falling Spring Appendix B
- Falling Spring Appendix C
- Falling Spring Appendix E
- Addendum 1 – Pre-Bid Meeting Q&A
- Addendum 2 – Addendum Questions
ETEC ERCOT RFP: Fall 2020 for 2021-23 Blocks
Power Supply | Release Date: 08/06/2020 | Due Date: 08/20/2020
ETEC ERCOT RFP: Fall 2020 for 2021-23 Blocks | Contact Steven Spiegel
Supporting documents:
Alpena Power Company RFP
Power Supply | Release Date: 07/17/2020 | Due Date: October 7, 2020, 4:00 PM Eastern
RFP to Provide Full Requirements/Partial Requirements Capacity and Renewable Services | Contact Garrett Cole, Kimberly Gentle, Steven Spiegel
Supporting documents:
- Attachment A – Alpena Historical Hourly Load – REVISED
- Alpena Annual Report 2019
- Alpena Annual Report 2018
- Alpena Annual Report 2017
- Industrial and Rate Class Data
- Industrial Interruptible Load Service
- APC RFP Response to Questions
- APC RFP Supplemental Response to Questions
- APC RFP Second Supplemental Response
Sulphur Springs Valley Electric Cooperative (SSVEC) RFP
Power Supply | Release Date: 07/16/2020 | Due Date: 08/25/2020
SSVEC Solar and Storage RFP Document| Contact Angela Strickland
Supporting Documents:
- Attachment B – SSVEC RFP Notice of Intent to Respond Form
- Attachment C – SSVEC RFP Technical Proposal Form
- Attachment D – 69 kv Breaker-metering
- Attachment E – Foundation Layouts
- Attachment F – SSVEC DG Interconnection Requirements
- Attachment G – Site KMZ File
- Attachment H – Topo Map
- Attachment I – Floodplain Brochure
- Attachment J – Floodplain Regs
- Attachment K – Survey
- Attachment L – SSVEC 2019 Audit
- Attachment M – SSVEC 2018 Audit
- Attachment N – Hourly SSVEC Load (2018-2019)
- SSVEC Solar and Storage Bidder Q&A
- SSVEC Solar and Storage Bidder Q&A (updated 8-18)
- SSVEC Site Arial Video
Paragould Light Water & Cable – Solar RFP
Power Supply | Release Date: 04/17/2020 | Due Date: 05/29/2020
Solar RFP Request Instructions | Contact Garrett Cole, Ryan Johnson, Justin Hey
Supporting Documents: